Skip to main content

6034

Details

AADF latest year 2013
Region East of England
Local authority Hertfordshire
Road name M10
Road type Major
Start junction road M1(7)
End junction road 1
Link length 4.60km (2.86 miles)
Easting & Northing 514220,205140
Latitude & longitude 51.73335,-0.34739

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2013 Estimated using AADF from previous year on this link 26,081 20,264 3,917 1,653 0 159 88
2012 Estimated using AADF from previous year on this link 25,769 20,243 3,665 1,610 0 161 89
2011 Manual count 25,743 20,537 3,396 1,558 0 169 83
2010 Estimated using AADF from previous year on this link 25,252 18,777 4,105 2,024 0 123 223
2009 Estimated using AADF from previous year on this link 25,531 19,180 3,966 2,048 0 130 207
2008 Estimated using AADF from previous year on this link 25,547 19,161 3,858 2,199 0 130 199
2007 Manual count 25,444 19,316 3,605 2,222 0 135 166
2006 Estimated using AADF from previous year on this link 26,435 20,642 3,561 1,970 0 170 92
2005 Manual count 26,120 20,580 3,316 1,982 0 146 96
2004 Estimated using AADF from previous year on this link 25,111 20,417 1,964 2,522 0 135 73
2003 Manual count 25,136 20,561 1,903 2,386 0 153 133
2002 Estimated using AADF from previous year on this link 25,831 20,440 2,635 2,176 0 359 221
2001 Manual count 25,340 20,138 2,519 2,155 0 317 211
2000 Manual count 24,678 19,139 2,745 2,615 0 108 71

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 6034 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 6034 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 14
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 28
Raw counts Vehicle counts recorded at this count point. 144

To apply more filters to downloads, or retrieve data split into pages you can use our API.