Skip to main content

50738

Details

AADF latest year 2024
Region Scotland
Local authority Highland
Road name A99
Road type Major
Start junction road B876
End junction road A836
Link length 20.80km (12.92 miles)
Easting & Northing 337428,966472
Latitude & longitude 58.58171,-3.07781

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Manual count 940 713 178 22 0 15 12
2023 Estimated using AADF from previous year on this link 821 587 177 14 8 23 20
2022 Estimated using AADF from previous year on this link 805 573 173 14 9 25 20
2021 Estimated using AADF from previous year on this link 744 534 155 13 9 22 19
2020 Estimated using AADF from previous year on this link 674 488 136 12 12 22 16
2019 Estimated using AADF from previous year on this link 895 669 159 14 10 29 25
2018 Estimated using AADF from previous year on this link 892 667 159 14 8 27 25
2017 Estimated using AADF from previous year on this link 890 670 152 14 8 28 27
2016 Estimated using AADF from previous year on this link 884 671 144 13 8 29 27
2015 Estimated using AADF from previous year on this link 865 663 133 13 8 28 28
2014 Estimated using AADF from previous year on this link 846 653 125 13 8 29 26
2013 Estimated using AADF from previous year on this link 825 645 115 13 10 27 26
2012 Estimated using AADF from previous year on this link 812 643 107 13 10 26 24
2011 Estimated using AADF from previous year on this link 828 655 111 13 11 28 21
2010 Estimated using AADF from previous year on this link 827 659 106 13 12 28 21
2009 Estimated using AADF from previous year on this link 849 684 103 13 12 31 18
2008 Manual count 836 680 96 13 11 29 18
2007 Estimated using AADF from previous year on this link 418 318 67 21 0 0 12
2006 Estimated using AADF from previous year on this link 424 327 64 21 0 0 12
2005 Estimated using AADF from previous year on this link 417 323 60 21 0 0 13
2004 Estimated using AADF from previous year on this link 415 327 55 19 0 0 14
2003 Estimated using AADF from previous year on this link 417 322 57 21 0 0 17
2002 Manual count 400 310 52 21 0 0 17
2001 Estimated using AADF from previous year on this link 914 755 111 2 16 23 23
2000 Estimated using AADF from previous year on this link 895 737 111 2 18 24 21

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 50738 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 50738 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 48
Raw counts Vehicle counts recorded at this count point. 72

To apply more filters to downloads, or retrieve data split into pages you can use our API.