Skip to main content

37525

Details

AADF latest year 2017
Region North East
Local authority Hartlepool
Road name A689
Road type Major
Start junction road LA boundary
End junction road LA Boundary
Link length 2.90km (1.80 miles)
Easting & Northing 441122,528000
Latitude & longitude 54.64545,-1.36431

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2017 Estimated using AADF from previous year on this link 20,085 14,767 3,487 1,753 10 63 15
2016 Estimated using AADF from previous year on this link 19,869 14,785 3,295 1,709 10 65 16
2015 Manual count 19,393 14,604 3,051 1,657 10 64 16
2014 Estimated using AADF from previous year on this link 18,138 13,138 3,155 1,713 4 95 37
2013 Estimated using AADF from previous year on this link 17,606 12,842 2,940 1,699 5 92 32
2012 Estimated using AADF from previous year on this link 17,509 12,998 2,769 1,623 5 87 31
2011 Estimated using AADF from previous year on this link 17,447 13,092 2,659 1,575 5 90 31
2010 Manual count 17,444 13,171 2,600 1,550 5 92 31
2009 Estimated using AADF from previous year on this link 19,461 14,580 3,059 1,719 6 45 58
2008 Manual count 19,672 14,772 2,961 1,841 5 43 55
2007 Estimated using AADF from previous year on this link 20,162 14,929 3,553 1,583 6 72 25
2006 Manual count 19,902 15,034 3,207 1,562 6 72 27
2005 Estimated using AADF from previous year on this link 18,533 13,942 2,574 1,920 6 32 65
2004 Manual count 18,523 14,041 2,461 1,919 4 34 68
2003 Estimated using AADF from previous year on this link 16,653 12,599 2,177 1,784 5 71 22
2002 Manual count 16,102 12,328 1,967 1,720 5 65 22
2001 Estimated using AADF from previous year on this link 14,933 10,993 1,854 1,964 16 58 64
2000 Manual count 14,510 10,662 1,756 1,977 18 53 62

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 37525 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 37525 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 18
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 36
Raw counts Vehicle counts recorded at this count point. 168

To apply more filters to downloads, or retrieve data split into pages you can use our API.