Manual count points

Site number: 16012

Site details

Region London
Local authority Hillingdon
Road name M4
Road classification Motorway
Managed by Highways England
Road type Major
Start junction LA Boundary
End junction 4
Link length 2.70km (1.68 miles)
Easting, northing 506000, 178400
Latitude, longitude 51.49461600, -0.47447910

Location

Annual Average daily flow

Year Count method Pedal cycles Two wheeled motor vehicles Cars and taxis Buses and coaches Light goods vehicles Heavy goods vehicles All motor vehicles
2023 Manual count 0 856 124266 769 18596 8085 152573
2022 Manual count 0 787 121285 546 18570 7833 149022
2021 Estimated using previous year's AADF on this link 0 345 106697 43 26051 8687 141824
2020 Manual count 0 339 93333 43 22287 7785 123786
2019 Manual count 0 999 131399 955 20237 8217 161807
2018 Estimated using previous year's AADF on this link 0 1233 124934 988 19838 6600 153593
2017 Manual count 0 1240 126009 984 19229 6472 153935
2016 Estimated using previous year's AADF on this link 0 1049 117022 786 21965 6019 146841
2015 Manual count 0 1036 116075 802 20683 5798 144394
2014 Manual count 0 1003 130343 886 21041 6276 159549
2013 Manual count 0 1095 137404 1197 17713 6047 163456
2012 Manual count 0 859 148108 1004 12843 9067 171881
2011 Manual count 0 763 130358 1120 14171 4955 151367
2010 Manual count 0 889 124261 835 14993 7165 148143
2009 Manual count 0 862 146702 833 15072 7257 170726
2008 Manual count 0 1493 127556 1327 14703 7665 152744
2007 Manual count 0 1458 123100 1505 21435 9195 156693
2006 Manual count 0 1210 119807 1438 13752 7329 143536
2005 Manual count 0 1437 116089 1494 14032 7431 140483
2004 Manual count 0 1313 115880 1264 13725 7236 139418
2003 Manual count 0 1551 128666 1310 13256 7060 151843
2002 Manual count 0 1461 123553 1216 12636 7226 146092
2001 Manual count 0 1958 122551 1513 14381 6894 147297
2000 Manual count 0 1936 127310 1367 14230 8356 153199

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as National Statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Data Description Records Download
Site details Manual count point site 16012 details. 1 JSON | CSV
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 24 JSON | CSV
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 48 JSON | CSV
Raw counts Vehicle counts recorded at this count point. 504 JSON | CSV