Skip to main content

966324

Details

AADF latest year 2009
Region South East
Local authority East Sussex
Road name B2192
Road type Minor
Start junction road -
End junction road -
Link length -
Easting & Northing 543399,111561
Latitude & longitude 50.88574,0.03729

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2009 Manual count 11,399 9,034 1,712 389 59 159 105
2008 Manual count 12,763 10,294 1,807 366 78 177 119
2007 Manual count 12,587 10,145 1,740 440 47 165 97
2006 Manual count 12,608 10,346 1,620 412 71 139 91
2005 Manual count 12,382 10,293 1,455 439 51 107 88
2004 Manual count 12,701 10,367 1,654 509 43 88 83
2003 Manual count 12,438 10,109 1,658 361 55 211 99
2002 Manual count 12,644 10,257 1,654 447 55 179 107
2001 Manual count 13,203 10,897 1,634 464 71 89 119
2000 Manual count 12,418 10,166 1,602 421 68 134 95

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 966324 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 966324 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 10
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 20
Raw counts Vehicle counts recorded at this count point. 240

To apply more filters to downloads, or retrieve data split into pages you can use our API.