Skip to main content

8637

Details

AADF latest year 2024
Region South East
Local authority West Sussex
Road name A259
Road type Major
Start junction road A27
End junction road A286
Link length 1.30km (0.81 miles)
Easting & Northing 485486,104387
Latitude & longitude 50.8327,-0.78745

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Manual count 16,684 14,677 1,618 156 175 130 103
2023 Estimated using AADF from previous year on this link 14,428 12,728 1,289 197 181 111 102
2022 Estimated using AADF from previous year on this link 14,175 12,493 1,267 200 184 113 101
2021 Estimated using AADF from previous year on this link 13,256 11,697 1,169 193 206 103 94
2020 Estimated using AADF from previous year on this link 12,057 10,617 1,072 179 252 98 91
2019 Estimated using AADF from previous year on this link 15,672 13,978 1,215 204 220 132 144
2018 Estimated using AADF from previous year on this link 15,517 13,804 1,226 204 201 141 142
2017 Estimated using AADF from previous year on this link 15,663 13,958 1,203 203 182 142 157
2016 Manual count 15,714 14,062 1,143 201 190 141 168
2015 Estimated using AADF from previous year on this link 16,168 14,215 1,485 272 22 65 131
2014 Estimated using AADF from previous year on this link 15,831 13,939 1,416 281 24 73 121
2013 Estimated using AADF from previous year on this link 15,371 13,571 1,324 273 24 77 126
2012 Estimated using AADF from previous year on this link 15,424 13,692 1,274 269 25 69 121
2011 Estimated using AADF from previous year on this link 15,620 13,909 1,259 269 26 72 111
2010 Estimated using AADF from previous year on this link 15,545 13,951 1,128 264 23 85 117
2009 Estimated using AADF from previous year on this link 15,538 14,035 1,056 255 23 89 103
2008 Estimated using AADF from previous year on this link 15,233 13,733 1,040 275 23 80 105
2007 Manual count 15,541 14,042 1,018 276 21 84 121
2006 Estimated using AADF from previous year on this link 13,121 11,520 1,071 334 32 38 158
2005 Estimated using AADF from previous year on this link 13,360 11,743 1,055 346 20 45 171
2004 Estimated using AADF from previous year on this link 13,860 12,309 990 326 24 54 181
2003 Estimated using AADF from previous year on this link 13,623 12,151 899 269 30 83 221
2002 Estimated using AADF from previous year on this link 14,009 12,618 828 278 33 58 227
2001 Estimated using AADF from previous year on this link 13,770 12,420 773 296 32 56 225
2000 Estimated using AADF from previous year on this link 14,167 12,818 767 313 34 54 215

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 8637 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 8637 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 50
Raw counts Vehicle counts recorded at this count point. 72

To apply more filters to downloads, or retrieve data split into pages you can use our API.