Skip to main content

77400

Details

AADF latest year 2016
Region East of England
Local authority Central Bedfordshire
Road name A5
Road type Major
Start junction road French's Avenue
End junction road A5120
Link length 0.40km (0.25 miles)
Easting & Northing 501000,222850
Latitude & longitude 51.89507,-0.5336

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2016 Estimated from nearby links 15,903 10,911 3,514 1,212 10 136 131
2015 Estimated from nearby links 15,275 10,594 3,254 1,169 7 131 128
2014 Estimated from nearby links 15,175 10,721 3,040 1,153 7 137 125
2013 Estimated from nearby links 14,792 10,572 2,828 1,137 9 132 122
2012 Estimated from nearby links 14,817 10,771 2,634 1,146 9 131 133
2011 Estimated from nearby links 15,028 11,082 2,511 1,158 10 142 135
2010 Estimated from nearby links 14,825 11,049 2,373 1,143 11 130 130
2009 Estimated from nearby links 14,987 11,263 2,307 1,144 11 147 126
2008 Estimated from nearby links 15,223 11,400 2,265 1,291 11 141 126
2007 Estimated from nearby links 21,019 15,002 3,664 1,852 17 329 172
2006 Estimated from nearby links 20,740 15,108 3,307 1,816 17 327 182
2005 Estimated from nearby links 20,274 14,855 3,156 1,771 18 302 190
2004 Estimated from nearby links 20,254 14,960 3,017 1,766 17 314 197
2003 Estimated from nearby links 19,641 14,710 2,711 1,672 18 310 238
2002 Estimated from nearby links 18,983 14,393 2,449 1,615 21 285 241
2001 Estimated from nearby links 18,509 13,988 2,429 1,580 20 279 233
2000 Estimated from nearby links 21,880 16,393 3,048 1,975 30 290 174

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 77400 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 77400 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 17
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 17
Raw counts Vehicle counts recorded at this count point. 0

To apply more filters to downloads, or retrieve data split into pages you can use our API.