Skip to main content

7689

Details

AADF latest year 2024
Region North West
Local authority Sefton
Road name A5057
Road type Major
Start junction road A5090
End junction road A5058
Link length 0.30km (0.19 miles)
Easting & Northing 334900,395050
Latitude & longitude 53.44819,-2.98168

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Estimated using AADF from previous year on this link 13,447 10,948 2,189 143 50 28 139
2023 Estimated using AADF from previous year on this link 13,244 10,785 2,150 143 49 27 138
2022 Estimated using AADF from previous year on this link 13,010 10,586 2,115 146 50 27 137
2021 Estimated using AADF from previous year on this link 12,155 9,911 1,951 141 56 25 127
2020 Manual count 11,063 8,996 1,789 131 68 24 123
2019 Estimated using AADF from previous year on this link 11,861 9,658 1,755 255 84 47 145
2018 Estimated using AADF from previous year on this link 11,760 9,539 1,770 257 77 50 144
2017 Estimated using AADF from previous year on this link 11,847 9,645 1,738 255 70 50 158
2016 Estimated using AADF from previous year on this link 11,842 9,716 1,651 255 73 50 170
2015 Estimated using AADF from previous year on this link 11,565 9,567 1,511 252 78 51 183
2014 Estimated using AADF from previous year on this link 11,313 9,381 1,441 263 84 58 170
2013 Estimated using AADF from previous year on this link 10,974 9,134 1,348 256 86 60 177
2012 Manual count 10,987 9,215 1,297 252 88 54 169
2011 Estimated using AADF from previous year on this link 10,249 8,063 1,710 223 38 36 217
2010 Estimated using AADF from previous year on this link 10,108 8,088 1,532 215 35 43 230
2009 Estimated using AADF from previous year on this link 10,024 8,136 1,435 205 35 45 203
2008 Estimated using AADF from previous year on this link 9,839 7,961 1,414 219 35 40 205
2007 Estimated using AADF from previous year on this link 10,021 8,140 1,385 217 32 42 237
2006 Estimated using AADF from previous year on this link 10,127 8,273 1,316 234 51 44 260
2005 Estimated using AADF from previous year on this link 10,307 8,433 1,296 247 32 51 280
2004 Manual count 10,649 8,840 1,216 235 38 62 296
2003 Estimated using AADF from previous year on this link 11,581 8,987 1,753 372 61 134 335
2002 Estimated using AADF from previous year on this link 11,753 9,332 1,614 369 69 94 344
2001 Estimated using AADF from previous year on this link 11,494 9,185 1,505 372 67 90 342
2000 Estimated using AADF from previous year on this link 11,756 9,479 1,495 369 70 86 327

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 7689 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 7689 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 50
Raw counts Vehicle counts recorded at this count point. 72

To apply more filters to downloads, or retrieve data split into pages you can use our API.