Skip to main content

75286

Details

AADF latest year 2024
Region North West
Local authority Sefton
Road name A5057
Road type Major
Start junction road A565
End junction road Merton Rd
Link length 0.30km (0.19 miles)
Easting & Northing 333750,395230
Latitude & longitude 53.44966,-2.99903

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Estimated using AADF from previous year on this link 12,852 10,682 1,929 158 95 56 27
2023 Estimated using AADF from previous year on this link 12,657 10,523 1,895 158 94 54 27
2022 Estimated using AADF from previous year on this link 12,434 10,328 1,864 160 95 55 27
2021 Estimated using AADF from previous year on this link 11,619 9,670 1,719 155 107 50 25
2020 Estimated using AADF from previous year on this link 10,570 8,777 1,577 144 131 47 24
2019 Manual count 13,609 11,555 1,787 164 114 64 38
2018 Estimated using AADF from previous year on this link 8,503 6,824 1,502 112 79 34 31
2017 Estimated using AADF from previous year on this link 8,555 6,900 1,474 111 71 35 35
2016 Estimated using AADF from previous year on this link 8,534 6,951 1,400 111 75 34 37
2015 Estimated using AADF from previous year on this link 8,311 6,844 1,282 109 80 35 40
2014 Estimated using AADF from previous year on this link 8,125 6,712 1,222 114 86 40 37
2013 Estimated using AADF from previous year on this link 7,869 6,534 1,143 111 89 42 39
2012 Estimated using AADF from previous year on this link 7,876 6,593 1,100 110 90 37 37
2011 Manual count 7,966 6,697 1,087 109 95 39 34
2010 Estimated using AADF from previous year on this link 7,720 5,915 1,498 169 32 58 80
2009 Estimated using AADF from previous year on this link 7,646 5,951 1,403 161 32 61 70
2008 Estimated using AADF from previous year on this link 7,505 5,823 1,383 174 32 55 70
2007 Estimated using AADF from previous year on this link 7,627 5,954 1,355 178 29 59 81
2006 Estimated using AADF from previous year on this link 7,678 6,051 1,286 191 46 61 89
2005 Estimated using AADF from previous year on this link 7,801 6,168 1,267 199 29 70 97
2004 Estimated using AADF from previous year on this link 8,026 6,466 1,188 185 34 85 102
2003 Estimated using AADF from previous year on this link 7,868 6,383 1,079 153 43 129 124
2002 Manual count 7,999 6,628 994 158 48 91 128
2001 Manual count 8,592 7,122 1,078 225 100 54 113
2000 Estimated using AADF from previous year on this link 8,819 7,349 1,070 240 104 52 108

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 75286 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 75286 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 50
Raw counts Vehicle counts recorded at this count point. 96

To apply more filters to downloads, or retrieve data split into pages you can use our API.