Skip to main content

74516

Details

AADF latest year 2012
Region East of England
Local authority Thurrock
Road name A1306
Road type Major
Start junction road A1090
End junction road A282
Link length 2.20km (1.37 miles)
Easting & Northing 556500,178780
Latitude & longitude 51.48632,0.25265

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2012 Estimated using AADF from previous year on this link 10,371 6,991 1,889 1,337 26 88 66
2011 Estimated using AADF from previous year on this link 10,501 7,193 1,800 1,346 28 95 67
2010 Manual count 10,339 7,172 1,702 1,313 32 87 65
2009 Estimated using AADF from previous year on this link 10,761 6,624 1,958 2,007 18 127 45
2008 Estimated using AADF from previous year on this link 11,003 6,704 1,921 2,211 16 122 45
2007 Estimated using AADF from previous year on this link 11,334 6,961 1,921 2,288 16 122 42
2006 Estimated using AADF from previous year on this link 11,144 7,147 1,742 2,094 16 123 38
2005 Estimated using AADF from previous year on this link 10,845 6,952 1,660 2,048 16 145 40
2004 Estimated using AADF from previous year on this link 10,857 6,959 1,581 2,119 16 158 40
2003 Manual count 10,802 6,953 1,568 2,081 16 153 47
2002 Manual count 11,098 7,683 1,556 1,684 10 126 49
2001 Manual count 11,278 7,555 1,584 1,911 11 146 82
2000 Estimated using AADF from previous year on this link 11,232 7,533 1,532 1,951 13 132 84

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 74516 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 74516 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 13
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 26
Raw counts Vehicle counts recorded at this count point. 96

To apply more filters to downloads, or retrieve data split into pages you can use our API.