Skip to main content

7269

Details

AADF latest year 2015
Region North West
Local authority West Cheshire
Road name A559
Road type Major
Start junction road A533
End junction road A530
Link length 3.30km (2.05 miles)
Easting & Northing 368000,374500
Latitude & longitude 53.26654,-2.48123

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2015 Estimated using AADF from previous year on this link 12,916 10,762 1,620 418 81 69 46
2014 Estimated using AADF from previous year on this link 12,655 10,553 1,545 436 87 79 43
2013 Estimated using AADF from previous year on this link 12,274 10,274 1,445 429 90 82 44
2012 Estimated using AADF from previous year on this link 12,294 10,366 1,390 422 91 74 42
2011 Estimated using AADF from previous year on this link 12,439 10,530 1,374 419 96 77 39
2010 Estimated using AADF from previous year on this link 12,331 10,561 1,232 406 87 91 41
2009 Estimated using AADF from previous year on this link 12,303 10,625 1,153 393 87 96 36
2008 Estimated using AADF from previous year on this link 12,082 10,396 1,136 428 87 86 36
2007 Manual count 12,306 10,630 1,113 431 77 90 42
2006 Estimated using AADF from previous year on this link 12,070 10,445 1,242 261 99 80 42
2005 Manual count 12,291 10,647 1,223 285 63 92 44
2004 Estimated using AADF from previous year on this link 12,045 10,077 1,497 357 64 42 72
2003 Manual count 11,768 9,947 1,359 308 78 65 89
2002 Estimated using AADF from previous year on this link 13,859 11,909 1,288 463 91 93 106
2001 Manual count 13,604 11,722 1,201 486 87 89 106
2000 Estimated using AADF from previous year on this link 13,994 11,945 1,441 387 125 94 127

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 7269 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 7269 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 16
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 32
Raw counts Vehicle counts recorded at this count point. 96

To apply more filters to downloads, or retrieve data split into pages you can use our API.