Skip to main content

6763

Details

AADF latest year 2024
Region London
Local authority Bexley
Road name A207
Road type Major
Start junction road Welling Way
End junction road A209
Link length 0.90km (0.56 miles)
Easting & Northing 546000,175940
Latitude & longitude 51.46361,0.10037

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Estimated using AADF from previous year on this link 11,698 9,211 1,439 76 171 254 718
2023 Estimated using AADF from previous year on this link 11,727 9,265 1,431 76 153 243 711
2022 Estimated using AADF from previous year on this link 11,713 9,285 1,406 78 149 240 706
2021 Estimated using AADF from previous year on this link 11,313 9,039 1,295 73 145 208 697
2020 Estimated using AADF from previous year on this link 10,536 8,379 1,215 69 163 182 691
2019 Manual count 13,594 11,053 1,393 80 132 239 829
2018 Estimated using AADF from previous year on this link 14,926 11,948 1,841 162 181 299 677
2017 Estimated using AADF from previous year on this link 14,928 11,958 1,804 166 183 297 704
2016 Estimated using AADF from previous year on this link 14,970 11,962 1,819 170 188 286 733
2015 Estimated using AADF from previous year on this link 15,103 12,214 1,763 166 182 267 693
2014 Estimated using AADF from previous year on this link 15,119 12,255 1,695 165 158 282 723
2013 Estimated using AADF from previous year on this link 15,061 12,220 1,640 176 141 272 754
2012 Estimated using AADF from previous year on this link 14,980 12,114 1,599 171 172 278 817
2011 Estimated using AADF from previous year on this link 15,233 12,350 1,638 160 199 256 829
2010 Manual count 15,253 12,387 1,646 159 201 258 803
2009 Estimated using AADF from previous year on this link 18,658 15,320 1,596 359 268 259 1,124
2008 Estimated using AADF from previous year on this link 18,806 15,444 1,639 384 247 274 1,065
2007 Estimated using AADF from previous year on this link 19,201 15,808 1,674 390 210 282 1,047
2006 Estimated using AADF from previous year on this link 19,364 16,048 1,638 348 163 287 1,043
2005 Estimated using AADF from previous year on this link 19,018 15,759 1,652 349 131 264 994
2004 Estimated using AADF from previous year on this link 19,138 15,935 1,619 366 129 287 931
2003 Estimated using AADF from previous year on this link 18,902 15,746 1,708 332 150 301 815
2002 Manual count 18,978 16,067 1,552 361 103 291 707
2001 Estimated using AADF from previous year on this link 18,990 16,092 1,707 308 146 293 590
2000 Estimated using AADF from previous year on this link 18,924 16,076 1,702 324 133 271 551

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 6763 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 6763 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 50
Raw counts Vehicle counts recorded at this count point. 72

To apply more filters to downloads, or retrieve data split into pages you can use our API.