Skip to main content

56018

Details

AADF latest year 2008
Region North West
Local authority Cheshire
Road name M6
Road type Major
Start junction road LA boundary
End junction road 19
Link length 13.10km (8.14 miles)
Easting & Northing 373400,374800
Latitude & longitude 53.26953,-2.4003

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2008 Manual count 119,506 81,717 14,756 22,516 0 230 287
2007 Manual count 120,960 82,152 14,492 23,437 0 294 585
2006 Manual count 121,232 82,632 16,188 21,854 0 150 408
2005 Estimated using AADF from previous year on this link 113,203 79,260 12,076 21,004 0 174 689
2004 Manual count 113,287 79,260 11,667 21,524 0 173 663
2003 Manual count 112,099 76,986 11,931 22,653 0 202 327
2002 Manual count 97,656 69,978 8,419 18,749 0 196 314
2001 Manual count 110,240 76,008 10,044 23,451 0 160 577
2000 Manual count 112,499 78,408 11,701 21,441 0 374 575

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 56018 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 56018 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 9
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 18
Raw counts Vehicle counts recorded at this count point. 192

To apply more filters to downloads, or retrieve data split into pages you can use our API.