Skip to main content

46897

Details

AADF latest year 2024
Region London
Local authority Merton
Road name A297
Road type Major
Start junction road A239
End junction road A24
Link length 0.60km (0.37 miles)
Easting & Northing 525994,168502
Latitude & longitude 51.40156,-0.19011

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2024 Estimated using AADF from previous year on this link 37,082 27,710 5,670 1,084 748 1,505 1,114
2023 Manual count 37,146 27,873 5,638 1,093 669 1,439 1,103
2022 Estimated using AADF from previous year on this link 34,793 25,737 5,596 1,200 649 1,191 1,068
2021 Manual count 33,441 25,057 5,154 1,141 634 1,033 1,055
2020 Estimated using AADF from previous year on this link 26,909 20,261 4,596 666 574 577 809
2019 Estimated using AADF from previous year on this link 34,492 26,728 5,272 764 464 757 971
2018 Estimated using AADF from previous year on this link 34,395 26,659 5,275 768 495 717 977
2017 Manual count 34,365 26,682 5,169 787 501 712 1,015
2016 Estimated using AADF from previous year on this link 26,571 20,930 3,408 770 115 619 845
2015 Estimated using AADF from previous year on this link 26,801 21,371 3,304 751 111 576 799
2014 Estimated using AADF from previous year on this link 26,816 21,443 3,176 755 97 609 833
2013 Manual count 26,715 21,381 3,072 805 86 588 869
2012 Estimated using AADF from previous year on this link 36,021 28,987 4,528 966 153 852 688
2011 Manual count 36,576 29,551 4,637 906 177 784 698
2010 Estimated using AADF from previous year on this link 38,803 31,333 4,309 1,339 278 752 1,070
2009 Manual count 39,699 32,202 4,357 1,333 287 801 1,006
2008 Estimated using AADF from previous year on this link 38,784 31,865 3,830 1,090 633 637 1,362
2007 Estimated using AADF from previous year on this link 39,637 32,614 3,912 1,118 541 654 1,339
2006 Estimated using AADF from previous year on this link 39,931 33,111 3,828 992 419 667 1,333
2005 Estimated using AADF from previous year on this link 39,263 32,514 3,862 1,004 337 612 1,271
2004 Estimated using AADF from previous year on this link 39,545 32,876 3,782 1,030 330 667 1,190
2003 Estimated using AADF from previous year on this link 39,157 32,486 3,993 938 383 698 1,042
2002 Estimated using AADF from previous year on this link 39,348 33,149 3,627 993 264 675 904
2001 Manual count 39,302 33,149 3,556 1,063 254 705 829
2000 Estimated using AADF from previous year on this link 44,470 36,570 5,169 1,270 264 694 767

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 46897 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 46897 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 50
Raw counts Vehicle counts recorded at this count point. 168

To apply more filters to downloads, or retrieve data split into pages you can use our API.