Skip to main content

27498

Details

AADF latest year 2012
Region East of England
Local authority Thurrock
Road name A1012
Road type Major
Start junction road A126
End junction road A1306
Link length 1.90km (1.18 miles)
Easting & Northing 561070,179000
Latitude & longitude 51.48701,0.31852

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2012 Estimated using AADF from previous year on this link 15,686 13,288 1,899 365 45 80 53
2011 Estimated using AADF from previous year on this link 15,875 13,499 1,877 366 48 84 49
2010 Estimated using AADF from previous year on this link 15,731 13,540 1,682 359 43 99 51
2009 Estimated using AADF from previous year on this link 15,691 13,622 1,575 345 43 104 45
2008 Estimated using AADF from previous year on this link 15,396 13,328 1,552 378 43 93 45
2007 Estimated using AADF from previous year on this link 15,683 13,629 1,520 385 38 97 52
2006 Estimated using AADF from previous year on this link 15,870 13,850 1,443 418 61 101 58
2005 Manual count 16,168 14,118 1,422 449 39 117 62
2004 Estimated using AADF from previous year on this link 14,509 12,180 1,447 687 39 75 120
2003 Estimated using AADF from previous year on this link 14,187 12,023 1,315 588 47 114 147
2002 Manual count 14,532 12,485 1,211 605 53 80 151
2001 Estimated using AADF from previous year on this link 14,025 11,577 1,461 713 104 162 112
2000 Manual count 14,431 11,947 1,451 771 108 155 107

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 27498 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 27498 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 13
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 26
Raw counts Vehicle counts recorded at this count point. 72

To apply more filters to downloads, or retrieve data split into pages you can use our API.