Skip to main content

17260

Details

AADF latest year 2018
Region North West
Local authority Lancashire
Road name A588
Road type Major
Start junction road A585
End junction road Cherry Tree Drive roundabout, Lancaster
Link length 29.40km (18.27 miles)
Easting & Northing 338233,447152
Latitude & longitude 53.91683,-2.94189

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2018 Manual count 6,017 4,817 917 115 33 136 32
2017 Manual count 5,132 4,124 766 110 18 114 18
2016 Estimated using AADF from previous year on this link 5,061 3,771 1,036 183 14 47 24
2015 Estimated using AADF from previous year on this link 4,930 3,725 959 174 14 47 25
2014 Estimated using AADF from previous year on this link 4,910 3,770 896 171 14 49 24
2013 Estimated using AADF from previous year on this link 4,791 3,718 833 169 18 48 23
2012 Estimated using AADF from previous year on this link 4,807 3,788 776 170 18 47 26
2011 Estimated using AADF from previous year on this link 4,885 3,897 740 171 19 51 26
2010 Estimated using AADF from previous year on this link 4,828 3,885 700 171 22 47 25
2009 Estimated using AADF from previous year on this link 4,883 3,960 680 166 22 53 24
2008 Manual count 4,934 4,008 668 183 19 51 24
2007 Manual count 5,092 4,075 478 301 13 205 33
2006 Manual count 5,262 4,324 619 177 23 96 46
2005 Manual count 4,986 4,103 574 175 13 99 35
2004 Manual count 4,810 3,947 555 208 17 66 34
2003 Manual count 4,605 3,755 495 219 19 115 21
2002 Manual count 4,287 3,510 550 182 16 24 21
2001 Manual count 4,036 3,266 562 171 0 22 15
2000 Manual count 4,089 3,387 514 119 17 50 19

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 17260 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 17260 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 19
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 38
Raw counts Vehicle counts recorded at this count point. 264

To apply more filters to downloads, or retrieve data split into pages you can use our API.