Manual count points

Site number: 78467

Site details

Region Wales
Local authority Bridgend
Road name A4063
Road classification 'A' road
Managed by Local authority
Road type Major
Start junction Church St, Caerau, Maesteg
End junction LA Boundary
Link length 0.90km (0.56 miles)
Easting, northing 286000, 194840
Latitude, longitude 51.64077463, -3.64884591

Location

Annual Average daily flow

Year Count method Pedal cycles Two wheeled motor vehicles Cars and taxis Buses and coaches Light goods vehicles Heavy goods vehicles All motor vehicles
2024 Estimated from nearby links 5 18 2201 4 527 34 2785
2023 Estimated from nearby links 5 18 2175 4 518 34 2750
2022 Estimated from nearby links 5 20 2123 4 508 34 2689
2021 Estimated from nearby links 5 18 1978 4 456 33 2489
2020 Estimated from nearby links 7 17 1808 3 398 31 2258
2019 Estimated from nearby links 6 18 2131 8 682 48 2887
2018 Estimated from nearby links 6 17 2126 8 684 48 2884
2017 Estimated from nearby links 5 17 2136 9 653 47 2862
2016 Estimated from nearby links 5 18 2139 9 617 46 2828
2015 Estimated from nearby links 5 18 2113 9 571 44 2754
2014 Estimated from nearby links 5 18 2138 9 534 43 2742
2013 Estimated from nearby links 6 18 2108 9 497 43 2674
2012 Estimated from nearby links 6 18 2148 9 463 42 2680
2011 Estimated from nearby links 6 18 2210 10 442 43 2723
2010 Estimated from nearby links 7 17 2204 10 418 40 2689
2009 Estimated from nearby links 6 11 1716 35 368 56 2186
2008 Estimated from nearby links 5 10 1738 35 361 61 2205
2007 Estimated from nearby links 5 10 1804 32 361 66 2273
2006 Estimated from nearby links 5 10 1853 30 328 61 2282
2005 Estimated from nearby links 5 12 1802 31 312 60 2217
2004 Estimated from nearby links 5 13 1804 31 297 62 2207
2003 Estimated from nearby links 5 13 1802 36 295 60 2206
2002 Estimated from nearby links 6 10 1786 35 262 61 2154
2001 Estimated from nearby links 6 10 1765 33 243 59 2110
2000 Estimated from nearby links 6 9 1759 33 234 59 2094

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as National Statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Data Description Records Download
Site details Manual count point site 78467 details. 1 JSON | CSV
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 25 JSON | CSV
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 25 JSON | CSV
Raw counts Vehicle counts recorded at this count point. 0 JSON | CSV