Manual count points

Site number: 40836

Site details

Region Scotland
Local authority Dumfries & Galloway
Road name A75
Road classification 'A' road
Managed by Transport Scotland
Road type Major
Start junction A714
End junction A712
Link length 1.70km (1.06 miles)
Easting, northing 242000, 564900
Latitude, longitude 54.95363600, -4.46883790

Location

Annual Average daily flow

Year Count method Pedal cycles Two wheeled motor vehicles Cars and taxis Buses and coaches Light goods vehicles Heavy goods vehicles All motor vehicles
2023 Automatic counter 3 90 3422 34 1234 602 5382
2022 Automatic counter 4 93 3373 34 1195 608 5302
2021 Automatic counter 5 90 3242 35 1208 665 5240
2020 Automatic counter 5 76 2792 29 994 579 4469
2019 Automatic counter 4 110 3557 40 1071 586 5364
2018 Automatic counter 3 106 3454 41 1053 577 5231
2017 Estimated using previous year's AADF on this link 4 130 4335 52 1252 705 6475
2016 Estimated using previous year's AADF on this link 4 129 4337 51 1175 684 6377
2015 Estimated using previous year's AADF on this link 4 125 4211 50 1088 670 6144
2014 Estimated using previous year's AADF on this link 4 127 4079 47 995 641 5889
2013 Estimated using previous year's AADF on this link 5 114 4027 44 944 635 5765
2012 Estimated using previous year's AADF on this link 5 109 4028 41 908 628 5714
2011 Estimated using previous year's AADF on this link 5 117 4029 39 867 622 5674
2010 Estimated using previous year's AADF on this link 5 110 3997 43 799 624 5573
2009 Estimated using previous year's AADF on this link 5 119 4095 41 780 623 5658
2008 Estimated using previous year's AADF on this link 5 113 4011 34 776 649 5583
2007 Manual count 5 126 4093 32 761 660 5672
2006 Estimated using previous year's AADF on this link 22 51 4424 54 1134 535 6198
2005 Estimated using previous year's AADF on this link 22 54 4295 53 1079 520 6001
2004 Estimated using previous year's AADF on this link 22 48 4278 51 1076 526 5979
2003 Estimated using previous year's AADF on this link 22 53 4231 79 1011 517 5891
2002 Estimated using previous year's AADF on this link 26 51 4096 41 968 528 5684
2001 Estimated using previous year's AADF on this link 24 47 3924 52 857 506 5386
2000 Estimated using previous year's AADF on this link 28 44 3920 52 825 485 5326

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as National Statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Data Description Records Download
Site details Manual count point site 40836 details. 1 JSON | CSV
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 24 JSON | CSV
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 48 JSON | CSV
Raw counts Vehicle counts recorded at this count point. 24 JSON | CSV