Manual count points

Site number: 27923

Site details

Region London
Local authority Hillingdon
Road name M25
Road classification Motorway
Managed by Highways England
Road type Major
Start junction 14
End junction LA Boundary
Link length 3.00km (1.86 miles)
Easting, northing 504031, 176656
Latitude, longitude 51.47930500, -0.50334503

Location

Annual Average daily flow

Year Count method Pedal cycles Two wheeled motor vehicles Cars and taxis Buses and coaches Light goods vehicles Heavy goods vehicles All motor vehicles
2023 Estimated using previous year's AADF on this link 0 722 152014 511 36641 19480 209368
2022 Automatic counter 0 744 147907 488 35480 19739 204357
2021 Automatic counter 0 651 128540 418 30761 19196 179566
2020 Automatic counter 0 717 126351 472 29644 19591 176775
2019 Manual count 0 1094 165759 741 30194 18320 216108
2018 Automatic counter 0 1639 168954 681 31427 16792 219492
2017 Manual count 0 1583 163695 652 29261 15867 211059
2016 Estimated using previous year's AADF on this link 0 1011 165024 665 31540 16224 214462
2015 Manual count 0 997 163687 678 29699 15786 210848
2014 Manual count 0 1040 207133 864 38449 15356 262842
2013 Manual count 0 2461 186314 1256 22484 15070 227585
2012 Manual count 0 1212 168343 708 21637 15585 207485
2011 Manual count 0 694 136784 427 19780 14901 172586
2010 Manual count 0 1157 140012 533 20555 23376 185633
2009 Manual count 0 926 177853 636 18345 15367 213127
2008 Manual count 0 1533 170354 1049 20933 16108 209977
2007 Manual count 0 979 148247 664 18270 15075 183235
2006 Manual count 0 944 123459 887 16145 15110 156545
2005 Estimated using previous year's AADF on this link 0 987 128220 467 18640 16213 164527
2004 Estimated using previous year's AADF on this link 0 997 129778 420 16793 16429 164417
2003 Manual count 0 1133 130693 765 16272 15730 164593
2002 Manual count 0 1132 141626 833 17810 16928 178329
2001 Manual count 0 1205 134473 597 17421 15921 169617
2000 Manual count 0 1680 143362 1248 17768 16000 180058

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as National Statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Data Description Records Download
Site details Manual count point site 27923 details. 1 JSON | CSV
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 24 JSON | CSV
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 48 JSON | CSV
Raw counts Vehicle counts recorded at this count point. 384 JSON | CSV