Manual count points

Site number: 17639

Site details

Region London
Local authority Westminster
Road name A4202
Road classification 'A' road
Managed by Local authority
Road type Major
Start junction A4 Hyde Park Corner
End junction Marble Arch
Link length 1.40km (0.87 miles)
Easting, northing 528089, 180542
Latitude, longitude 51.50929800, -0.15567552

Location

Annual Average daily flow

Year Count method Pedal cycles Two wheeled motor vehicles Cars and taxis Buses and coaches Light goods vehicles Heavy goods vehicles All motor vehicles
2023 Manual count 2998 3538 42369 4432 8250 1746 60334
2022 Estimated using previous year's AADF on this link 2349 3089 34929 4138 8945 1913 53014
2021 Manual count 2294 2679 34006 4088 8239 1810 50822
2020 Automatic counter 634 2279 39041 3394 7877 1684 54275
2019 Automatic counter 512 3840 65976 5240 11650 2469 89176
2018 Manual count 568 3853 69612 5588 12363 2639 94055
2017 Automatic counter 565 3492 66831 4755 12433 1259 88770
2016 Manual count 559 3394 67305 4990 12628 1312 89628
2015 Manual count 792 4142 67242 5871 10837 3333 91425
2014 Manual count 670 3525 71470 5896 12843 2891 96625
2013 Manual count 633 4112 62648 6154 12488 2343 87746
2012 Manual count 912 4242 76379 5750 11385 2818 100574
2011 Manual count 867 2736 60969 3490 10388 2487 80070
2010 Manual count 652 3966 73104 5430 10480 2736 95716
2009 Manual count 851 4177 68657 5209 10321 2636 91000
2008 Manual count 1602 4515 72811 5163 11420 2318 96227
2007 Manual count 878 5619 69769 4510 16307 2997 99202
2006 Manual count 1528 6977 74219 5513 12656 3533 102898
2005 Manual count 1208 8662 68637 5520 13620 3613 100052
2004 Manual count 1063 7195 70768 3469 12063 3205 96700
2003 Manual count 632 5157 72156 4197 9562 2994 94066
2002 Estimated using previous year's AADF on this link 492 4141 94112 4745 7164 3456 113618
2001 Manual count 516 4400 105506 4105 7916 3362 125289
2000 Manual count 784 5161 90977 2726 12708 2262 113834

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as National Statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Data Description Records Download
Site details Manual count point site 17639 details. 1 JSON | CSV
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 24 JSON | CSV
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 48 JSON | CSV
Raw counts Vehicle counts recorded at this count point. 456 JSON | CSV